Profile of facilities
System Flow
The Integrated Seawater Desalination and Sewage Reuse System
Play the Video
Features of the Integrated Seawater Desalination and Sewage Reuse System
Inside the approximately 6,000m² premises of Water Plaza Kitakyushu, lies a “demo plant” for the demonstration of an advanced water recycling and reuse system and a “test bed” to develop cutting-edge technologies. The demo plant, which employs an energy saving, low cost and low environmental impact water production system integrating both seawater desalination and sewage recycling processes, produces 1,400m³ of water per day. At the test bed (5 zones), R&D activities can be conducted utilizing six types of water from the demo plant.
Facilities Drawing
Access
96-1, Nishiminato-machi, Kokurakita-ku, Kitakyushu City, Fukuoka Pref. 803-0801
c/o Hiagari Sewage Treatment Plant By car
5 minutes from the Hiagari IC of the Kitakyushu Urban Expressway-2.
Water Plaza Kitakyushu has a parking lot for guests. By train
JR Kokura Station, 15-minute taxi to the plaza
c/o Hiagari Sewage Treatment Plant By car
5 minutes from the Hiagari IC of the Kitakyushu Urban Expressway-2.
Water Plaza Kitakyushu has a parking lot for guests. By train
JR Kokura Station, 15-minute taxi to the plaza
Contact
International Project Division, Water and Sewer Bureau, City of Kitakyushu1-1, Otemachi, Kokurakita-ku, Kitakyushu City, 803-8510
TEL:+81-93-582-2012
FAX:+81-93-582-2088
e-mail:sui-jigyou@city.kitakyushu.lg.jp